ECC Limestone Quarry
Ongoing
Akle, San Ildefonso, Bulacan
Eagle Cement Corporation
DELTA runs the quarry operations supplying Eagle Cement's San Ildefonso plant, with estimated volume of over 2 million metric tons per year of limestone and shale, backed by brand-new rigid trucks and a well-equipped workshop for high mechanical availability.
Scope of Work
Detailed mine planning, confirmatory drilling, site development, drilling and blasting, excavation and hauling, stockpile maintenance, pit and haul-road maintenance, and materials blending.