RCBMI – Teresa Limestone Quarry

Ongoing Brgy. Dulumbayan, Teresa, Rizal Republic Cement & Building Materials, Inc. (CRH–Aboitiz)
RCBMI – Teresa Limestone Quarry

About 30 km southeast of Metro Manila, the Teresa operation produces a minimum of 110,000 metric tons of limestone each month, with DELTA operating the site since 2006.

Scope of Work

Drilling and blasting, loading and hauling of broken material to the crushers and stockpile, and access-road and stockpile maintenance.